High voltage Battery Module Assembly (BMA) transport hanger
TKS - 2301

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Special Service Tool illustration

Used to transferring the high voltage Sub Battery Pack Assembly (Sub-BPA) and Battery Module Assembly (BMA)
High voltage battery module surface pressure jig
09375 - GI800

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Special Service Tool illustration

Used for compressing the high voltage Sub Battery Pack Assembly (Sub-BPA)
High voltage battery module guide
09375 - GI900

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Special Service Tool illustration

Used for seating the high voltage battery module on the surface pressure jig
High voltage battery module disassembly jig
TMS - 1907

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Special Service Tool illustration

Used for disassembling the high voltage Sub Battery Pack Assembly (Sub-BPA)

Removal
Warning
•
When working on the high voltage system, the work should be performed by technicians who have completed the relevant training. A lack of understanding of the high voltage system can lead to serious accidents due to electric shock or short circuit.
•
When working on the high voltage system or related components, be sure to observe and be aware of the "Safety Precautions, Cautions and Warnings". If not, it may cause serious accidents due to electric shock or short circuit.
•
When working on high voltage system, make sure to check the Personal Protective Equipment (PPE) and high voltage shut-off procedure.
Note
Do not step on or apply a load when removing the Sub Battery Pack Assembly (Sub-BPA). The lower part of the Sub-BPA may break if a load is applied.
Information
•
Install the high voltage battery module surface pressure jig and guide before using the high voltage battery module disassembly jig. (Refer to the equipment manufacturer's manual)
•
The procedure for removing the Sub Battery Pack Assembly (Sub-BPA) below is for #1. Other Sub-BPAs are performed in the same procedures.

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Removal illustration

1.
Remove the Battery System Assembly (BSA) upper case.
(Refer to High Voltage Battery System - "Case")
2.
Remove the main fuse negative ( - ) bus bar (A) after removing the bolt and nut.

Tightening torque :
7.8 - 11.8 N·m (0.8 - 1.2 kgf·m, 5.8 - 8.7 lb·ft)

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Removal illustration

3.
Remove the FR junction box to Power Relay Assembly (PRA) bus bars (A) after removing the bolts and nuts.

Tightening torque :
7.8 - 11.8 N·m (0.8 - 1.2 kgf·m, 5.8 - 8.7 lb·ft)

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Removal illustration

4.
Disconnect the all Cell Monitoring Unit (CMU) voltage & temperature sensing connector (A).

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Removal illustration

Warning
The following procedures must be followed in order to prevent surge voltage from occurring on the Battery Module Assembly (BMA) internal circuit or in the CMU internal circuit due to potential differences.
•
When disconnecting CMU connector, follow the order from CMU#8>CMU#7>CMU#6>CMU#5>CMU#4>CMU#3>CMU#2>CMU#1.
•
Even if only one CMU is defective, the above procedures must be followed when removing and replacing existing CMUs.
•
The black connector on CMU is voltage sensing connector.
•
Refer to the image below for the CMU number.

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Removal illustration

5.
Disconnect the Battery Management Unit (BMU) wiring connector (A).

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Removal illustration

6.
Remove the voltage & temperature sensing wiring (A) after removing the wiring clip from the CMU.

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Removal illustration

7.
Remove the battery terminal pad (A)

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Removal illustration

8.
Disconnect the voltage & temperature sensing wiring connectors (A) and remove the fixing clips (B).

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Removal illustration

9.
Remove the battery module bus bars (A) after removing the bolts.

Tightening torque :
7.8 - 11.8 N·m (0.8 - 1.2 kgf·m, 5.8 - 8.7 lb·ft)

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Removal illustration

10.
Install the battery terminal cover (TKS - 2301) (A).

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Removal illustration

Note
•
Be sure to install the battery terminal cover (TKS - 2301) to prevent safety accidents caused by contact with objects.
•
Install the cover to battery negative ( - ) terminal.
11.
Remove the mounting bracket (A) after removing the bolts.

Tightening torque
Step 1 : 8.8 N·m (0.9 kgf·m, 6.5 lb·ft)
Step 2 : 10.8 N·m (1.1 kgf·m, 8.0 lb·ft)

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Removal illustration

12.
Remove the bolts and nuts of Sub Battery Pack Assembly (Sub-BPA) (A).

Tightening torque
Step 1 : 8.8 N·m (0.9 kgf·m, 6.5 lb·ft)
Step 2 : 10.8 N·m (1.1 kgf·m, 8.0 lb·ft)

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Removal illustration

13.
Install the high voltage battery module assembly hanger (TKS - 2301) in the Sub-BPA.

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Removal illustration

Note
•
Work on the high voltage battery module disassembly jig (TMS - 1907) by installing the removed Sub-BPA to it.
•
Note for handling as damage and deformation on the lower side of the Sub-BPA may cause fire.

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Removal illustration

Information
Refer to the equipment manufacturer's manual for how to use battery module assembly hanger (TKS - 2301).
14.
Transfort the Sub-BPA (A) using the crane jack.

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Removal illustration

15.
Install the removed Sub-BPA (A) on high voltage battery module assembly disassembly jig (TMS - 1907).

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Removal illustration

Information
For detailed instructions on how to use it, refer to the manual of manufacturer of Battery Module Disassembly jig (TMS - 1907).
16.
Remove the remaining gap filler on the Sub-BPA downside surface and the lower case.
Note
•
Carefully remove the gap filler so that the lower part of the module is not deformed after wearing the insulating gloves.
•
Remove with the plastic remover to prevent scratches on the lower case.
•
Be careful not to contact the bottom of the module when the air gun is used.
Installation
Warning
•
When working on the high voltage system, the work should be performed by technicians who have completed the relevant training. A lack of understanding of the high voltage system can lead to serious accidents due to electric shock or short circuit.
•
When working on the high voltage system or related components, be sure to observe and be aware of the "Safety Precautions, Cautions and Warnings". If not, it may cause serious accidents due to electric shock or short circuit.
•
When working on high voltage system, make sure to check the Personal Protective Equipment (PPE) and high voltage shut-off procedure.
1.
Perform the cell balancing procedures when the Battery Module Assembly (BMA) is replaced with a new one.
(Refer to High Voltage Battery System - "Battery Module Assembly (BMA)")
2.
Apply a new gap filler with the Special Service Tool (SST).
(Refer to High Voltage Battery System - "Gap Filler Application")
3.
Install in the reverse order of removal.
Note
•
Install the Sub Battery Pack Assembly (Sub-BPA) to the specified torque.
•
If the Sub-BPA is dropped, it may cause internal damage. (Do not reuse)
•
Do not reuse the bus bar mounting bolts. (Loctite applied)

Battery Control System (Long Range) — High Voltage Battery System / Sub-Battery Pack Assembly (Sub-BPA) / Removal and Installation / Installation illustration

4.
Perform the High Voltage Battery Pack Connector Check with the KDS before installing the Battery System Assembly (BSA) upper case.
(S/W Management → Battery Management System (BMS) → High Voltage Battery Pack Connector Check)
5.
Perform the air tightness inspection with the KDS.
(Refer to High Voltage Battery System - "Air Tightness Inspection")
6.
Perform the SOC calibration with the KDS.
(S/W management → Battery Management System (BMS) → SOC Calibration)
Information
Refer to the KDS screen for operating conditions and details.

Other information:

Kia EV6 (CV/CV1A) 2022-2026 Workshop Manual: General Service Information

General Information General Service Information 1. Protect the vehicle's protective painted surfaces and internal parts with work covers (seat covers) or tape (if damaged by tools) to prevent damage. Before closing the hood, check the PE room for any tools or parts left.

Kia EV6 (CV/CV1A) 2022-2026 Workshop Manual: A Guide to Storage, Transport and Disposal of Old Battery Systems

Used high voltage battery system storage, transportation, disposal guide • When working on the high voltage system, the work should be performed by technicians who have completed the relevant training.

Categories

 
Copyright © 2026 Kia EV6 Manuals ⏱ 0.0181